Projects

Air-Cooled Chiller Installation

This turnkey project was truly unique in that it encompassed the installation of a full “Mechanical Equipment Room” (MER) on the roof of a building in Downtown Manhattan.

Chiller Plant Replacement

Prime Mechanical is proud to have delivered the turnkey gut/replacement of a Chiller Plant located on the 19th floor of a Building in Downtown, Manhattan.

Condenser Water Riser Replacement

For this turnkey project, Prime Mechanical demolished and replaced 17 stories of 6” condenser water risers in a fully occupied Midtown East hotel.

Cooling Tower Refurbishment

Prime Mechanical managed the turnkey gut restoration of an existing crossflow cooling tower in Manhattan's Financial District.

Cooling Tower Replacement

This turnkey project involved the like-in-kind replacement of an existing 180-ton forced draft counterflow cooling tower in a historic condominium building in Tribeca.

IT Lab

Prime Mechanical delivered this turnkey installation of a new supplemental packaged water-cooled AC unit to serve a new IT Lab located in Times Square, Manhattan.

Large Commercial Interior Fitout

In this extensive mechanical installation, Prime Mechanical partnered with a general contractor to outfit a 70,000 square foot space for a new tenant.

Open Cooling Tower Installation

This turnkey project was truly unique in that it encompassed the installation of a full “Mechanical Equipment Room” (MER) on the roof of a building in Downtown Manhattan.

Retail Unit A

In a collaborative effort with a general contracting partner, Prime Mechanical executed the installation of a new mechanical system to serve a retail space in Midtown Manhattan.

RTU Replacement

In this turnkey project, Prime Mechanical replaced seven rooftop units (RTUs) that serve a municipal building in Garden City.